Skip to main content

CERN Accelerating science

    • Sign in
  • Directory
home
High Luminosity LHC Project

Main navigation

  • Home
  • About
    • The project
    • Collaboration Institutes
    • International Contributions
    • Relations with Industry
    • Related projects
  • Structure
  • media
    • Animations
    • Videos
    • Photos
    • HiLumi 3D
    • Knowing HiLumiers
    • Outreach
    • HLCB Newsletter
    • Accelerating News
  • Intranet
  • search

Vacuum

Robotic solution: successful preparation of the CMS rotating shielding for future HL-LHC vacuum module installation

By Florence Thompson (CERN)

WP8, Vacuum, CMS
21/03/2025

Robotic solution: successful preparation of t...

WP8, Vacuum, CMS
21/03/2025

Installation of Laser Engineered Demonstrator Chamber in the LHC

LHC, HL-LHC, High-Luminosity, Vacuum, LESS
13/02/2024

Installation of Laser Engineered Demonstrator...

LHC, HL-LHC, High-Luminosity, Vacuum, LESS
13/02/2024

Follow Us

W M 1  

DOCUMENTS

  • Logo
  • Graphic charter
  • Preliminary Design Report
  • Technical Design Report 2020

HILUMI LHC EC FP7 DESIGN STUDY

  • Website (archived)

QUACO PROJECT

  • Website

Useful links (members only)

  • HiLumi Calendar
  • HiLumi Intranet
  • Presentation templates
  • Publication guidelines
CERN
Copyright  © 2025 CERN